Skip to content
Quevell
Menu

Approvals

Configure project approval stages, assign people, record decisions and resubmit an issue after changes.

Updated 25 Nov 2026

In an approval process, participants review an issue and record their decisions. For example, a release may need development and testing reviews followed by the release owner's decision. Approval works separately from the workflow: it can restrict entry into selected statuses, but never changes the issue status itself.

Configure a project template

A project administrator opens Project settings → Approvals and expands the section. Create approval template above the template list opens a separate screen within Quevell. Edit opens the same editor for the selected template. Enter its name and description, then add stages in the intended order. Stages run sequentially. Add named slots within each stage, such as Development and Testing, and assign one active project member to each slot. Each template version stores its assigned approvers.

The same person may occupy several slots, including within one stage. Each slot needs a separate decision. Assignment grants no access to the project or issue: the approver must already have access and an active personal account.

Choose a rule for each stage:

RuleHow the stage finishes
Every slot must approveAll slots must approve. One rejection ends the process as rejected
One slot approval is enoughThe first approval completes the stage. One rejection leaves the other slots available; rejection by every slot ends the process as rejected

A request for changes pauses the process under either rule. Resubmission must be explicit after the issue is corrected.

Under Application, choose Selected issue types, All issue types or Do not start automatically. The template starts when an issue of a matching type is created or an existing issue changes to that type. An issue type cannot have more than three active templates that start automatically. Manual templates are available only from an existing issue's actions menu.

Application also contains Statuses requiring approval and Restart approvals when the issue changes. When more than three types or statuses are selected, +N opens the remaining selections, where you can remove them. Use the search field below to add values. A template protecting statuses must explicitly apply to selected types or all types. Without protected statuses, the process does not restrict transitions. A restriction refers to actual project statuses, rather than categories. Correct unavailable types, statuses or assigned people before activation. Restart is unchecked in a new draft.

Save the draft with Save in the editor. The link with the project key and catalogue name returns to templates. You can open or reload the editor URL directly; Quevell asks for confirmation before leaving unsaved changes. Then return to the template list and separately click Activate. Saving a draft does not start approvals, block statuses or notify approvers. Users can choose only active templates. The Edit action on a published template creates a draft of a new version; existing processes continue using their original version.

Activation applies to new issues; it does not bulk-start approvals on existing issues. Deactivation prevents new processes from starting with that template. Existing processes and their transition restrictions remain in force; the interface warns about active processes before deactivation. A template that has been used can be archived. Only an unused draft can be deleted.

Start an approval

The issue creation form contains no approval fields. The system starts all active templates matching the issue type, using their assigned approvers. The issue, processes, assignments and history are saved together. If an approver is unavailable or the issue creator is assigned to approve their own process, the issue is not saved. The error identifies the template and slot. The system never skips an approval or chooses a replacement.

On an existing issue, open Issue actions → Start approval and select a manual template or an active template that applies to this issue type. The action is also available inside the expanded section containing applicable templates or existing processes. This requires permission to edit the issue. Select only the template: people and stages are configured by the project administrator.

An issue can have at most three simultaneously active processes. A paused process requesting changes also occupies a place. Completed processes remain in history and do not occupy this limit. The same template cannot be added to an issue twice. To repeat the approval, restart the existing process: the system creates a new cycle.

An administrator can place the block through Project settings → Field layout in the top band, main column, side column or bottom band. Position and order are saved in the shared Layout configuration. An active template automatically makes the block visible for matching issue types, including existing issues. If absent, Layout adds it in the main column; a saved order and zone are preserved. An applicable template without a process is labelled Not started: no approval has been submitted yet. When neither applicable templates nor saved processes exist, no empty block is shown.

Change the issue type

Changing the type within a project starts new active templates that match the new type. Templates set to Do not start automatically are excluded. If the issue already has a process for a template, no second instance is created, even if the first is complete. Returning to a previous type does not start another cycle either.

Existing processes retain their versions, assignments, decisions, history and status restrictions. Changing the type alone does not restart decisions. If text or dates change at the same time, the ordinary restart rules apply.

The new type and new processes are saved together. If an approver is unavailable, the initiator is assigned to approve their own process or the limit of three active processes would be exceeded, the entire type change is rejected. The previous type, decisions and history remain unchanged. The person changing the type initiates the new processes; when using Sign in as a user, history also records the administrator who acted.

Make a decision

The Approvals section is collapsed when the issue card opens. Its heading shows the process count and approvals awaiting a decision. Expand it to see stages, their rules, slots and assigned people. The assigned approver can decide a slot in the current stage. An administrator using the authorized Sign in as a user feature can decide on behalf of the assigned approver. The history records both the approver and the administrator who acted. The security banner remains visible. Neither the effective voter nor actual operator may decide a process they initiated. Automation and service accounts cannot decide.

You can approve a slot, request changes or reject. A comment is required for changes requests and rejection, and optional for approval. If you occupy two slots, decide each separately. Completion does not move the issue to another status: perform the appropriate transition yourself.

After changes are requested, the initiator corrects the issue and chooses Resubmit for approval. If restart is enabled in the template version, the new cycle starts from the first stage. Confirming a changed text/date save with Save and restart approvals is also an explicit restart: no additional resubmission click is required afterwards. Otherwise, earlier positive decisions are retained and the requesting stage awaits a new decision.

Following rejection, the initiator or project administrator can restart the process with a required reason. They can also cancel an active process with a reason. Previous cycles and decisions remain in history. Cancellation is not approval and does not remove a protected-status restriction.

Change an issue after a decision

When restart is enabled, actual changes to the summary, description, text/date custom fields, start date or due date are considered. Saving the same normalized values does not restart anything. Changing type, status, assignee, reporter, priority, relationships, labels, sprint, comments, time or attachments does not itself restart decisions.

Before saving, the interface lists affected approvals. You can cancel the save or choose Save and restart approvals. Only a successful confirmed save creates new cycles from the first stage. Assignments are retained if the people are still eligible. The confirmation does not offer participant selection. Unavailable assignments require correction by a project administrator; earlier decisions stay unchanged. A failed save changes neither the issue nor its approvals.

If restarting a completed process would create a fourth active approval, the issue change is not saved. First complete or cancel an active process. When restart is disabled, decisions remain and history separately records the content change.

Enter a protected status

Before a transition, the system checks applicable templates for the issue type and restrictions pinned to existing processes. A missing process, pending decision, changes request, rejection or cancellation does not satisfy the check. The message names blocking templates. For an older issue missing a required process, the denied attempt starts it from the configured template after rolling back the attempted transition. Invalid configuration leaves the transition blocked and is recorded for correction. When moving an issue to another project, Quevell checks the destination project settings, issue type and selected status. If that status requires an approval that does not yet exist, first move the issue into an allowed, unprotected status. Then request the protected transition to start the required review. After approval, repeat the transition.

If the issue is already in that status, activating a template does not move it out. Leaving the status is not blocked by that approval restriction either. Ordinary permissions and workflow conditions still apply. The same checks apply on boards, through API, MCP, automation, imports and moves to another project.

Configure an absence

Set absence dates and a deputy in your profile. Separately enable Reassign my approval requests while I am away. This choice does not depend on ordinary issue reassignment but uses the same dates and deputy.

Waiting and new requests go to an eligible deputy, who is the assigned approver. Any active project member with access to the issue can be a deputy; the role name does not restrict the choice. Assignment does not widen access. An unavailable deputy or circular delegation leaves a visible warning; the initiator or project administrator must correct the assignment.

If one deputy receives several slots, each requires a separate decision. Existing decisions are not reassigned. When the absence ends, pending assignments delegated automatically return to the original approver. Decisions made by the deputy are retained and manual reassignments are not undone. If the original approver is inactive or has lost issue access, the return is blocked and the initiator is notified: they or a project administrator must correct the assignment.

Read history

Open Approval history on the process card. Each cycle stores the issue version, text and dates reviewed, assignments, decisions, comments and timestamps. Current content never replaces the historical content. Past decisions are immutable; another review creates a new cycle.

Template changes, activation, assignments and delegation, decisions, restarts, cancellations and denied transition attempts are recorded. Decision evidence survives issue or project deletion within the company's history. Deleting the entire company follows the ordinary data-retention rules.

Requests and changes use the company's normal notification rules and the recipient's personal preferences. Approvals introduce no separate reminders, escalations or automatic issue transitions.

API and MCP

API operations are listed in the reference; assistant access is described in the MCP guide. Both use the same permissions, cycle and slot versions, restrictions and self-approval prohibition. MCP writes require a unique requestId; replaying the same request does not create another decision.

An unconfirmed text or date change returns approval.reset_confirmation_required with affected template names. After reviewing the list, submit the same versioned change with confirmApprovalReset: true. An automation field-setting action must explicitly permit restarting approvals; permission is absent by default. Neither an API call nor a rule can bypass active-process capacity or silently refresh a stale version.